Fire-Rated

McDonald’s

Fire-rated and PVC hoarding installation completed for the refurbishment works at McDonald’s White Rose Leeds. The hoarding system provided a safe and secure separation of the work area throughout the project, including secure access solutions for site operatives. Great work by the team on another clean and successful installation.

McDonald’s Read More »

Wingstop

A high-quality 60-minute fire-rated hoarding solution installed for WINGSTOP UK at Manchester Arndale, combining safety, durability, and a professional retail finish.

Wingstop Read More »

Garage

18 linear metres of 60-minute fire-rated hoarding, installed to a height of 4.5 metres within a live retail environment at Manchester Arndale. Fully enclosed with a Firefly lid and incorporating a fire-rated double access door — delivered safely and with minimal disruption to surrounding retailers.  

Garage Read More »

SKVP

17 linear metres of 60-minute fire-rated hoarding, installed to a height of 3.5 metres within a live environment. Fully enclosed with a Firefly lid and incorporating a fire-rated double access door, with vinyl graphics installed — ensuring safety, compliance, and minimal disruption to surrounding operations.  

SKVP Read More »

Neal’s Yard Remedies

Fire-rated hoarding and branded vinyl graphics installed for refurbishment works at Neal’s Yard Remedies within a busy shopping centre. The installation provided a safe and secure separation of the construction area while maintaining an attractive and professional appearance for shoppers throughout the refurbishment works. Complete with bespoke printed vinyls, the hoarding helped minimise the visual

Neal’s Yard Remedies Read More »

bloq hoardings pandora vinyl graphics.webp

Pandora

60-minute fire-rated hoarding installed at 3.5 metres high within a live retail environment. Completed overnight, including full vinyl application, ensuring a seamless finish ready for trading the following day.

Pandora Read More »

Clintons

60-minute fire-rated hoarding installed at 9 metres high within a live retail environment. Incorporating a double access door, the installation required specialist access equipment, with a spider crane used to safely deliver the works at height — ensuring minimal disruption to surrounding retailers.

Clintons Read More »